East Lima-Marysville substation interconnection queue
3 active projects totaling 89.5 MW in the PJM queue, plus 3 with terminal status (shown grayed).
6 PJM queue filings name East Lima-Marysville as the point of interconnection, all in OH.
Target commercial operation dates as filed run from Dec 2019 to Feb 2023 (6 filings).
3active projects
89.5active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-491 | East Lima-Marysville 345kV | 345 | 133 | Wind | Withdrawn | May 2021 |
| AB2-170 | Hardin Energy Center | 345 | 49.4 | Solar | In Service | Jun 2021 |
| AI2-270 | East Lima-Marysville 345kV | 345 | 45 | Solar | Withdrawn | Feb 2023 |
| U2-072 | Scioto Ridge Wind Farm | 345 | 32.5 | Wind | In Service | May 2021 |
| U2-041 | Hardin Wind Farm | 345 | 21.7 | Wind | Withdrawn | Dec 2019 |
| V3-028 | Hardin Energy Center | 345 | 7.6 | Solar | In Service | Jun 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Champaign County, OH
- East Sidney-Quincy: 3 active, 86.4 MW of 5 filed
- Kings Creek: none active of 6 filed
- Givens-Mechanicsburg: none active of 3 filed
- Mechanicsburg - Darby: none active of 3 filed
- West Mingo: none active of 3 filed
- Woodstock: none active of 3 filed
- Givens - Mechanicsburg: none active of 2 filed
- Mechanicsburg: none active of 2 filed
Other PJM queue substations in Hardin County, OH
- Hardin Switch: 7 active, 409.9 MW of 9 filed
- Gunn Road: 2 active, 74 MW of 4 filed
- West Newton-Lynn: 1 active, 46.9 MW of 2 filed
- South Kenton: 1 active, 32.7 MW of 3 filed
- Ada-Dunkirk: 2 active, 12 MW of 3 filed
- East Lima-South Kenton: none active of 3 filed
- Forest: none active of 3 filed
- Marysville-Gunn Road: none active of 2 filed