East Lima-Marysville substation interconnection queue
3 active projects totalling 89.5 MW in the PJM queue, plus 3 with terminal status (shown greyed).
3active projects
89.5active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-491 | East Lima-Marysville 345kV | 345 | 133 | Wind | Withdrawn |
| AB2-170 | Hardin Energy Center | 345 | 49.4 | Solar | In Service |
| AI2-270 | East Lima-Marysville 345kV | 345 | 45 | Solar | Withdrawn |
| U2-072 | Scioto Ridge Wind Farm | 345 | 32.5 | Wind | In Service |
| U2-041 | Hardin Wind Farm | 345 | 21.7 | Wind | Withdrawn |
| V3-028 | Hardin Energy Center | 345 | 7.6 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.