Substation Scout

Talbert - Hawkins Gate & Talbert to Morgantown substation interconnection queue

1 active project totaling 250 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Talbert - Hawkins Gate & Talbert to Morgantown as the point of interconnection, all in Charles County, MD.

Target commercial operation dates as filed run from Jun 2030 to Jun 2031 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: PEPCO (2 filings).

1active projects
250active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1338 Talbert - Hawkins Gate 230 kV & Talbert to Morgantown 230 kV 230 510 Gas Withdrawn Jun 2031
C01-1616 Talbert - Hawkins Gate 230 kV & Talbert to Morgantown 230 kV 230 250 Battery Active Jun 2030

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-09-28C01-1338Terminal status510 Active → Withdrawn

Other PJM queue substations in Charles County, MD

All 50 PJM queue filings in Charles County, MD.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first