Talbert - Hawkins Gate & Talbert to Morgantown substation interconnection queue
1 active project totaling 250 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Talbert - Hawkins Gate & Talbert to Morgantown as the point of interconnection, all in Charles County, MD.
Target commercial operation dates as filed run from Jun 2030 to Jun 2031 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: PEPCO (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1338 | Talbert - Hawkins Gate 230 kV & Talbert to Morgantown 230 kV | 230 | 510 | Gas | Withdrawn | Jun 2031 |
| C01-1616 | Talbert - Hawkins Gate 230 kV & Talbert to Morgantown 230 kV | 230 | 250 | Battery | Active | Jun 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-28 | C01-1338 | Terminal status | 510 | Active → Withdrawn |
Other PJM queue substations in Charles County, MD
- Morgantown-Oak Grove: 1 active, 725 MW of 4 filed
- Morgantown: 2 active, 270 MW of 10 filed
- Hughesville: 3 active, 200 MW of 6 filed
- Kelson Ridge: 2 active, 75 MW of 4 filed
- Ripley: 1 active, 10.5 MW of 2 filed
- Burches Hill: none active of 7 filed
- Morgantown/Oak Grove: none active of 3 filed
- Talbert: none active of 3 filed
- Morgantown / Oak Grove: none active of 2 filed