Substation Scout

Kelson Ridge substation interconnection queue

2 active projects totalling 75 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
75active MW
4total filed
Queue IDProjectkVMWResourceStatus
W4-044 Kelson Ridge 230kV 230 725 Gas Withdrawn
AD1-114 CPV Maryland 230 75 Gas In Service
X4-006 St. Charles Combined Cycle Facility 230 0 Gas In Service
X4-007 Kelson Ridge 230kV 230 0 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.