Morgantown/Oak Grove substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
B15 Morgantown/Oak Grove 230kV 230 550 Gas Withdrawn
B16 Morgantown/Oak Grove 230kV 230 550 Gas Withdrawn
C03 Morgantown/Oak Grove 230kV 230 550 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.