Ripley substation interconnection queue

1 active project totalling 10.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
10.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
AC2-120 Ripley Solar 69 10.5 Solar In Service
AC2-013 Ripley 69kV 69 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.