Prince William, VA interconnection queue
14 active projects totalling 644 MW in the PJM queue, plus 25 with terminal status (shown greyed).
14active projects
644active MW
39total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| E22 | Burches Hill 500kV | 500 | 960 | Gas | Withdrawn |
| V1-031 | Possum Point 230kV | 230 | 875 | Gas | Withdrawn |
| T180 | Gainesville 230kV | 230 | 650 | Gas | Withdrawn |
| P08 | Possum Point | n/r | 600 | Gas | Withdrawn |
| X4-013 | Pleasant View-Edwards Ferry 230kV | 230 | 200 | Not reported | Withdrawn |
| AG2-113 | Nokesville-Vint Hill 230 kV | 230 | 150 | Battery | Withdrawn |
| AG2-284 | Catharpin 230 kV | 230 | 150 | Battery | Withdrawn |
| AG2-304 | Liberty 230 kV | 230 | 150 | Battery | Withdrawn |
| AG2-306 | Possum Point 230 kV | 230 | 150 | Battery | Withdrawn |
| C01-1933 | Liberty 230 kV | 230 | 145 | Battery | Active |
| AI2-231 | Gainesville-Loudoun 230 kV | 230 | 120 | Battery | Withdrawn |
| AH2-034 | Possum Point 230kV | 230 | 100 | Battery | Withdrawn |
| AH2-035 | Possum Point 500kV | 500 | 100 | Battery | Withdrawn |
| C01-1128 | Possum Point 230 kV | 230 | 100 | Battery | Active |
| AH1-741 | Not reported | n/r | 97 | Gas | Withdrawn |
| AH1-696 | Possum Point 230kV | 230 | 94 | Gas | Active |
| AG1-143 | Gainesville-Loudoun 230 kV | 230 | 80 | Battery | Withdrawn |
| AH2-032 | Possum Point 115kV | 115 | 60 | Battery | Withdrawn |
| AH2-033 | Possum Point 115kV | 115 | 60 | Battery | Withdrawn |
| C01-1127 | Possum Point 115 kV | 115 | 60 | Battery | Active |
| C01-1259 | Possum Point 115 kV | 115 | 60 | Battery | Active |
| R80 | Possum Point Unit 6 | 230 | 60 | Gas | In Service |
| AH2-060 | Possum Point 230 kV | 230 | 55 | Battery | Withdrawn |
| AH2-061 | Possum Point 230 kV II | 230 | 55 | Battery | Withdrawn |
| C01-1264 | Possum Point 230 kV | 230 | 55 | Battery | Active |
| AH2-058 | Possum Point 115 kV | 115 | 30 | Battery | Withdrawn |
| AH2-059 | Possum Point 115 kV II | 115 | 30 | Battery | Withdrawn |
| C01-1263 | Possum Point 115 kV | 115 | 30 | Battery | Active |
| AG2-065 | River Ridge 34.5 kV | 34.5 | 20 | Battery | Withdrawn |
| AH1-126 | Bowman 12.5kV | 12.5 | 20 | Battery | Withdrawn |
| C01-1294 | Liberty 115 kV | 115 | 20 | Battery | Active |
| C01-1295 | Liberty 115 kV | 115 | 20 | Battery | Active |
| S99 | Possum Point 230kV | 230 | 20 | Other | Withdrawn |
| AC2-072 | Nokesville | 35 | 13.3 | Solar | Withdrawn |
| AA2-079 | Possum Point Unit 6 | 230 | 0 | Gas | In Service |
| AA2-185 | Independent Hill 115kV | 115 | 0 | Gas | Withdrawn |
| AH1-124 | Reid Energy Center | 34.5 | 0 | Battery | UC |
| AH1-127 | Railroad Energy Center | 34.5 | 0 | Battery | UC |
| AH1-128 | Bethlehem Energy Center | 34.5 | 0 | Battery | UC |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.