Liberty substation interconnection queue

3 active projects totalling 185 MW in the PJM queue, plus 2 with terminal status (shown greyed).

3active projects
185active MW
5total filed
Queue IDProjectkVMWResourceStatus
AG2-304 Liberty 230 kV 230 150 Battery Withdrawn
C01-1933 Liberty 230 kV 230 145 Battery Active
C01-1294 Liberty 115 kV 115 20 Battery Active
C01-1295 Liberty 115 kV 115 20 Battery Active
O21 Liberty 69kV 69 9.6 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.