Liberty substation interconnection queue
3 active projects totalling 185 MW in the PJM queue, plus 2 with terminal status (shown greyed).
3active projects
185active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-304 | Liberty 230 kV | 230 | 150 | Battery | Withdrawn |
| C01-1933 | Liberty 230 kV | 230 | 145 | Battery | Active |
| C01-1294 | Liberty 115 kV | 115 | 20 | Battery | Active |
| C01-1295 | Liberty 115 kV | 115 | 20 | Battery | Active |
| O21 | Liberty 69kV | 69 | 9.6 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.