Substation Scout

Antietam substation interconnection queue

1 active project totalling 0 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AA1-122 Antietam 34.5kV 34.5 3.8 Solar Withdrawn
AB2-097 Hagerstown Plant 34.5 0 Solar In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.