Wilson 138kV
PJM queue ID C01-1568
Wilson 138kV (C01-1568) is listed in the PJM interconnection queue as a 300 MW battery project in Allegheny County, PA. The filing names Wilson as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 30, 2030.
| Queue ID | C01-1568 |
|---|---|
| Project name | Wilson 138kV |
| Status (as published) | Active |
| Substation | Wilson |
| Point of interconnection | Wilson 138kV |
| County | Allegheny |
| State | PA |
| Voltage | 138 kV |
| Capacity | 300 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-09-30 |
| Source dataset | cycle |
Same substation and county
Wilson substation: 6 requests in the PJM queue, 1 active totaling 300 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AA1-068 | Wilson 34.5kV | 2.3 | Solar | Withdrawn |
| AA1-080 | Wilson 34.5kV | 2.3 | Solar | Withdrawn |
| AA1-096 | Wilson 12.5kV | 2.3 | Solar | Withdrawn |
| AB1-078 | Wilson 34.5kV | 0 | Battery | Withdrawn |
| AB1-166 | Wilson Battery Storage | 0 | Battery | Withdrawn |
Allegheny, PA: 64 requests in the PJM queue, 11 active totaling 1,589.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | ENGIE IR Holdings LLC |
|---|---|
| Transmission owner | DL |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 300.0 |
| MW capacity | 300.0 |
| MFO | 300.0 |
| Submitted date | 4/27/2026 |
| Last updated | 7/14/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.