East New Market substation interconnection queue

1 active project totalling 35 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
35active MW
5total filed
Queue IDProjectkVMWResourceStatus
AC1-190 New Market Solar 69 35 Solar Suspended
Y2-062 East New Market 69kV 69 7.6 Solar Withdrawn
X2-084 East New Market 69kV 69 7.5 Solar Withdrawn
AA2-144 East New Market 12kV 12 6.8 Solar Withdrawn
AB1-113 East New Market 12kV 12 3.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.