Richfield Solar and Storage
PJM queue ID AB2-172
Richfield Solar and Storage (AB2-172) is listed in the PJM interconnection queue as a 19 MW solar project in Dorchester County, MD. The filing names Todd as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 10, 2024.
| Queue ID | AB2-172 |
|---|---|
| Project name | Richfield Solar and Storage |
| Status (as published) | In Service |
| Substation | Todd |
| Point of interconnection | Todd 69kV |
| County | Dorchester |
| State | MD |
| Voltage | 69 kV |
| Capacity | 19 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-01-10 |
| Source dataset | serial |
Same substation and county
Todd substation: 16 requests in the PJM queue, 4 active totaling 46.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1642 | Todd 69 kV | 14.5 | Solar | Active |
| X3-008 | Dorchester County Solar 1 Project | 7.6 | Solar | In Service |
| C01-1650 | Todd 25 kV | 5.8 | Solar | Active |
| C01-1646 | Todd 69 kV | 50 | Battery | Withdrawn |
| AE1-087 | Richfield Solar and Storage | 16 | Battery | Withdrawn |
| AI2-176 | Todd 69 kV | 14.5 | Solar | Withdrawn |
| AG2-092 | Todd 69 kV | 11 | Solar | Withdrawn |
| W4-078 | Todd 25kV | 7.6 | Solar | Withdrawn |
| AI2-177 | Todd 25 kV | 5.8 | Solar | Withdrawn |
| G03 | Todd 69kV | 5 | Gas | Withdrawn |
| AH1-316 | Todd 25 kV | 4.4 | Solar | Withdrawn |
| AA2-147 | Todd 12kV | 2.7 | Solar | Withdrawn |
3 more on the substation page.
Dorchester, MD: 44 requests in the PJM queue, 8 active totaling 105.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 50 |
| MW capacity | 19 |
| MFO | 50 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.