14 active projects totalling 1,455.7 MW in the PJM queue, plus 15 with terminal status (shown greyed).

14active projects
1,455.7active MW
29total filed
Queue IDProjectkVMWResourceStatus
C01-2159 Waugh Chapel 230 kV 230 490 Battery Active
C01-1802 Brandon Shores 230 kV 230 269 Gas Active
AA2-054 Pumphrey 230kV 230 155 Not reported In Service
AG2-319 Brandon Shores 230 kV 230 150 Battery Withdrawn
C01-1564 Riverside 115 kV 115 150 Battery Active
C01-2039 Brandon Shores 230 kV 230 141.4 Battery Active
AG1-104 Chapel Energy Storage Facility 230 120 Battery Withdrawn
AG2-207 Brandon Shores 230 kV 230 110 Battery Withdrawn
C01-1552 Wagner 115 kV 115 50 Battery Active
C01-1553 Wagner 115 kV 115 50 Battery Active
C01-1565 Riverside 115 kV 115 50 Battery Active
C01-1566 Riverside 115 kV 115 50 Battery Active
AG2-225 Wagner 115 kV 115 46 Battery Withdrawn
C01-1862 Waugh Chapel 115kV 115 kV 115 42.8 Solar Withdrawn
AF2-435 Waugh Chapel 115 kV 115 33 Solar Withdrawn
AG2-617 Waugh Chapel 115 kV 115 33 Solar Active
X3-008 Dorchester County Solar 1 Project 69 7.6 Solar In Service
C01-2244 Shipley 34.5 kV 34.5 5 Battery Active
V3-037 Millersville Landfill & Resource Recovery Facility 13 4 Gas In Service
AB2-125 Marriott Hill 34kV 34 1.2 Solar Withdrawn
AG1-063 Fairhaven Battery Energy Storage System n/r 0.7 Battery In Service
AB1-035 Mill Creek 240v n/r 0 Battery Withdrawn
AB1-037 Ridgeview 240v n/r 0 Battery Withdrawn
AB1-038 Shadyside 240v n/r 0 Battery Withdrawn
AB1-039 Lipins Corner 240v n/r 0 Battery Withdrawn
AB1-041 Hunt Club 240v n/r 0 Battery Withdrawn
AB1-042 Wall Cove 240v n/r 0 Battery Withdrawn
AB1-043 Riva Road 240v n/r 0 Battery Withdrawn
AB1-071 Greenbury Point 240V n/r 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.