Vienna substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).

4 PJM queue filings name Vienna as the point of interconnection, all in Dorchester County, MD.

Target commercial operation dates as filed run from Dec 2004 to Jun 2022 (4 filings).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
G28 Vienna 230kV 230 390 Gas Withdrawn Dec 2004
AF2-409 Vienna 138 kV 138 100 Battery Withdrawn Jun 2022
AF2-410 Vienna 18 kV 18 10 Battery Withdrawn Jun 2021
V2-028 Vienna Solar Facility n/r 2.3 Solar Withdrawn Nov 2018

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Vienna” in MD. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Dorchester County, MD

All 44 PJM queue filings in Dorchester County, MD.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first