Brandon Shores substation interconnection queue
2 active projects totaling 410.4 MW in the PJM queue, plus 3 with terminal status (shown grayed).
5 PJM queue filings name Brandon Shores as the point of interconnection, all in MD.
Target commercial operation dates as filed run from Jul 2011 to Aug 2030 (5 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: BGE (2 filings).
2active projects
410.4active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1802 | Brandon Shores 230 kV | 230 | 269 | Gas | Active | Aug 2030 |
| AG2-319 | Brandon Shores 230 kV | 230 | 150 | Battery | Withdrawn | Dec 2025 |
| C01-2039 | Brandon Shores 230 kV | 230 | 141.4 | Battery | Active | Aug 2029 |
| AG2-207 | Brandon Shores 230 kV | 230 | 110 | Battery | Withdrawn | Mar 2023 |
| W3-123 | Brandon Shores | n/r | 0 | Not reported | Withdrawn | Jul 2011 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Anne Arundel County, MD
- Waugh Chapel: 1 active, 490 MW of 5 filed
- Riverside: 3 active, 250 MW of 5 filed
- Pumphrey: 1 active, 155 MW of 4 filed
- Todd: 4 active, 46.9 MW of 16 filed
- Wagner: 1 active, 0 MW of 5 filed
Site Scanner