Brandon Shores substation interconnection queue

2 active projects totalling 410.4 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
410.4active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-1802 Brandon Shores 230 kV 230 269 Gas Active
AG2-319 Brandon Shores 230 kV 230 150 Battery Withdrawn
C01-2039 Brandon Shores 230 kV 230 141.4 Battery Active
AG2-207 Brandon Shores 230 kV 230 110 Battery Withdrawn
W3-123 Brandon Shores n/r 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.