Waugh Chapel substation interconnection queue
1 active project totaling 490 MW in the PJM queue, plus 4 with terminal status (shown grayed).
5 PJM queue filings name Waugh Chapel as the point of interconnection, all in Anne Arundel County, MD.
Target commercial operation dates as filed run from Sep 2023 to Oct 2029 (5 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: BGE (3 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2159 | Waugh Chapel 230 kV | 230 | 490 | Battery | Active | Jan 2029 |
| AG1-104 | Chapel Energy Storage Facility | 230 | 120 | Battery | Withdrawn | Jun 2029 |
| C01-1862 | Waugh Chapel 115kV 115 kV | 115 | 42.8 | Solar | Withdrawn | Oct 2029 |
| AF2-435 | Waugh Chapel 115 kV | 115 | 33 | Solar | Withdrawn | Sep 2023 |
| AG2-617 | Waugh Chapel 115 kV | 115 | 33 | Solar | Withdrawn | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Waugh Chapel (BGE, 21 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AG2-617 | Terminal status | 33 | Active → Withdrawn |
Same name on other Substation Scout pages
Other sources that print a substation named “Waugh Chapel” in MD. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Waugh Chapel: Expansion Tracker, PJM planning: PJM system-wide state not printed
Other PJM queue substations in Anne Arundel County, MD
- Brandon Shores: 2 active, 410.4 MW of 5 filed
- Riverside: 3 active, 250 MW of 5 filed
- Pumphrey: 1 active, 155 MW of 4 filed
- Todd: 4 active, 46.9 MW of 16 filed
- Wagner: 1 active, 0 MW of 5 filed