Waugh Chapel substation interconnection queue

2 active projects totalling 523 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
523active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-2159 Waugh Chapel 230 kV 230 490 Battery Active
AG1-104 Chapel Energy Storage Facility 230 120 Battery Withdrawn
C01-1862 Waugh Chapel 115kV 115 kV 115 42.8 Solar Withdrawn
AF2-435 Waugh Chapel 115 kV 115 33 Solar Withdrawn
AG2-617 Waugh Chapel 115 kV 115 33 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.