Waugh Chapel substation interconnection queue
2 active projects totalling 523 MW in the PJM queue, plus 3 with terminal status (shown greyed).
2active projects
523active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2159 | Waugh Chapel 230 kV | 230 | 490 | Battery | Active |
| AG1-104 | Chapel Energy Storage Facility | 230 | 120 | Battery | Withdrawn |
| C01-1862 | Waugh Chapel 115kV 115 kV | 115 | 42.8 | Solar | Withdrawn |
| AF2-435 | Waugh Chapel 115 kV | 115 | 33 | Solar | Withdrawn |
| AG2-617 | Waugh Chapel 115 kV | 115 | 33 | Solar | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.