Substation Scout

Waugh Chapel substation interconnection queue

1 active project totalling 490 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
490active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-2159 Waugh Chapel 230 kV 230 490 Battery Active
AG1-104 Chapel Energy Storage Facility 230 120 Battery Withdrawn
C01-1862 Waugh Chapel 115kV 115 kV 115 42.8 Solar Withdrawn
AF2-435 Waugh Chapel 115 kV 115 33 Solar Withdrawn
AG2-617 Waugh Chapel 115 kV 115 33 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.