Adams, IL interconnection queue

1 active project totalling 56.9 MW in the PJM queue, plus 7 with terminal status (shown greyed).

1active projects
56.9active MW
8total filed
Queue IDProjectkVMWResourceStatus
H20_CE12 Not reported n/r 700 Coal Withdrawn
Z2-086 Not reported n/r 200 Wind Withdrawn
J06_CE16 Not reported n/r 100 Hydro Withdrawn
AF2-366 Red Maple Solar 138 56.9 Solar Engineering and Procurement
AF2-393 Nelson-Dixon 138 kV 138 55 Battery Withdrawn
AF2-394 Nelson-Dixon 138 kV 138 40 Battery Withdrawn
O12 Geneva Energy LLC 138 20 Other Deactivated
AH1-517 Not reported n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.