Harwood substation interconnection queue
2 active projects totalling 300 MW in the PJM queue, plus 3 with terminal status (shown greyed).
2active projects
300active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| A11 | Hazelton | 230 | 201 | Gas | In Service |
| D03 | Haxelton Units 2-4 | 69 | 99 | Gas | In Service |
| U4-016 | Harwood | n/r | 48 | Gas | Withdrawn |
| N51 | Harwood 230kV | 230 | 20 | Wind | Withdrawn |
| AG2-227 | Harwood 69 kV | 69 | 13.2 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.