Substation Scout

Harwood-Berwick substation interconnection queue

1 active project totalling 0 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AC1-151 Harwood-Berwick 69kV 69 7.6 Solar Withdrawn
W1-111 Beacon Power Flywheel Station 69 0 Battery In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.