Plymouth substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-035 | Plymouth 34.5 kV | 34.5 | 13.5 | Solar | Withdrawn |
| AH1-007 | Plymouth 69 kV | 69 | 12 | Solar | Withdrawn |
| X1-067 | Plymouth | n/r | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.