Substation Scout

Plymouth substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-035 Plymouth 34.5 kV 34.5 13.5 Solar Withdrawn
AH1-007 Plymouth 69 kV 69 12 Solar Withdrawn
X1-067 Plymouth n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.