Salem-Beacon Power substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG1-277 Salem-Beacon Power 69 kV 69 32 Hybrid Withdrawn
AI2-442 Salem-Beacon Power 69 kV 69 20 Hybrid Withdrawn
AG1-278 Salem-Beacon Power 69 kV 69 15.4 Hybrid Withdrawn
AG1-279 Salem-Beacon Power 69 kV 69 15.4 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.