0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).

4 PJM queue filings name Salem-Beacon Power as the point of interconnection, all in Luzerne County, PA.

Target commercial operation dates as filed run from Jun 2022 to Dec 2027 (4 filings).

Transmission owner as filed: PPL (3 filings).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-277 Salem-Beacon Power 69 kV 69 32 Hybrid Withdrawn Jun 2022
AI2-442 Salem-Beacon Power 69 kV 69 20 Hybrid Withdrawn Dec 2027
AG1-278 Salem-Beacon Power 69 kV 69 15.4 Hybrid Withdrawn Jun 2022
AG1-279 Salem-Beacon Power 69 kV 69 15.4 Hybrid Withdrawn Jun 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Luzerne County, PA

All 83 PJM queue filings in Luzerne County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first