Salem-Beacon Power substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Salem-Beacon Power as the point of interconnection, all in Luzerne County, PA.
Target commercial operation dates as filed run from Jun 2022 to Dec 2027 (4 filings).
Transmission owner as filed: PPL (3 filings).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-277 | Salem-Beacon Power 69 kV | 69 | 32 | Hybrid | Withdrawn | Jun 2022 |
| AI2-442 | Salem-Beacon Power 69 kV | 69 | 20 | Hybrid | Withdrawn | Dec 2027 |
| AG1-278 | Salem-Beacon Power 69 kV | 69 | 15.4 | Hybrid | Withdrawn | Jun 2022 |
| AG1-279 | Salem-Beacon Power 69 kV | 69 | 15.4 | Hybrid | Withdrawn | Jun 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Luzerne County, PA
- Susquehanna-Lackawanna: 3 active, 1,045 MW of 4 filed
- Shickshinny: 2 active, 466.8 MW of 2 filed
- Harwood: 2 active, 300 MW of 5 filed
- Hunlock Creek: 2 active, 176 MW of 4 filed
- Susquehanna: 4 active, 68 MW of 13 filed
- Bear Creek: 1 active, 5.2 MW of 7 filed
- Jenkins-Harwood #2: none active of 3 filed
- Mountain: none active of 3 filed
- Plymouth: none active of 3 filed
- Wright: none active of 3 filed
- East Hazelton: none active of 2 filed
- East Hazelton-Weatherly Tap: none active of 2 filed
- Harwood-Berwick: 1 active, 0 MW of 2 filed
- Hunlock: none active of 2 filed
- Susquehanna - Alburtis: none active of 2 filed