East Hazelton-Weatherly Tap substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name East Hazelton-Weatherly Tap as the point of interconnection, all in Luzerne County, PA.

Target commercial operation date as filed: Mar 2028 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-164 Club Ford Energy Center 69 12 Solar Withdrawn Mar 2028
AG1-165 Club Ford Energy Center 69 12 Solar Withdrawn Mar 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-11-23AG1-164Terminal status12 Engineering and Procurement → Withdrawn
2026-11-23AG1-165Terminal status12 Engineering and Procurement → Withdrawn

Other PJM queue substations in Luzerne County, PA

All 83 PJM queue filings in Luzerne County, PA.