East Hazelton-Weatherly Tap substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name East Hazelton-Weatherly Tap as the point of interconnection, all in Luzerne County, PA.
Target commercial operation date as filed: Mar 2028 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-164 | Club Ford Energy Center | 69 | 12 | Solar | Withdrawn | Mar 2028 |
| AG1-165 | Club Ford Energy Center | 69 | 12 | Solar | Withdrawn | Mar 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-23 | AG1-164 | Terminal status | 12 | Engineering and Procurement → Withdrawn |
| 2026-11-23 | AG1-165 | Terminal status | 12 | Engineering and Procurement → Withdrawn |
Other PJM queue substations in Luzerne County, PA
- Susquehanna-Lackawanna: 3 active, 1,045 MW of 4 filed
- Shickshinny: 2 active, 466.8 MW of 2 filed
- Harwood: 2 active, 300 MW of 5 filed
- Hunlock Creek: 2 active, 176 MW of 4 filed
- Susquehanna: 4 active, 68 MW of 13 filed
- Bear Creek: 1 active, 5.2 MW of 7 filed
- Salem-Beacon Power: none active of 4 filed
- Jenkins-Harwood #2: none active of 3 filed
- Mountain: none active of 3 filed
- Plymouth: none active of 3 filed
- Wright: none active of 3 filed
- East Hazelton: none active of 2 filed
- Harwood-Berwick: 1 active, 0 MW of 2 filed
- Hunlock: none active of 2 filed
- Susquehanna - Alburtis: none active of 2 filed