Shickshinny substation interconnection queue

2 active projects totalling 466.8 MW in the PJM queue.

2active projects
466.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-2038 Shickshinny 500 kV 500 250 Battery Active
C01-1801 Shickshinny 500 kV 500 216.8 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.