Substation Scout

Jenkins-Harwood #2 substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
O28 Penobscot Mountain WF 69 10.2 Wind Withdrawn
L07 Mountain Top 69 8.6 Wind Withdrawn
M02 Mountain Top n/r 8.1 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.