Home / PJM / substation / Hunlock Creek
Hunlock Creek substation interconnection queue
2 active projects
totalling 176 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2 active projects
176 active MW
4 total filed
Queue ID Project kV MW Resource Status
E08
Hunlock Creek
n/r
500
Gas
Withdrawn
Q52
Hunlock Creek
n/r
300
Coal
Withdrawn
T117
Hunlock Creek
69
126
Gas
In Service
B26
Hunlock Creek 66kV
66
50
Gas
In Service
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.