Northumberland Solar (AE2-042) is listed in the PJM interconnection queue as a 43.5 MW solar project in Northumberland County, PA. The filing names Milton as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 31, 2025.
| Queue ID | AE2-042 |
|---|---|
| Project name | Northumberland Solar |
| Status (as published) | In Service |
| Substation | Milton |
| Point of interconnection | Milton 69 kV |
| County | Northumberland |
| State | PA |
| Voltage | 69 kV |
| Capacity | 43.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2025-07-31 |
| Source dataset | serial |
Same substation and county
Milton substation: 4 requests in the PJM queue, 1 active totaling 43.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-388 | Milton 69 kV | 20.2 | Solar | Withdrawn |
| AG1-050 | Milton 69 kV | 20 | Battery | Withdrawn |
| X3-041 | Milton | 5.7 | Solar | Withdrawn |
Northumberland, PA: 36 requests in the PJM queue, 7 active totaling 129.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 65 |
| MW capacity | 43.5 |
| MFO | 65 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.