Substation Scout

I.C. Air Rights substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH2-205 I.C. Air Rights 12.5 kV 12.5 10 Battery Withdrawn
AH2-206 I.C. Air Rights 12.5 kV 12.5 10 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.