Calumet substation interconnection queue
3 active projects totaling 400 MW in the PJM queue, plus 1 with terminal status (shown grayed).
4 PJM queue filings name Calumet as the point of interconnection, all in Cook County, IL.
Target commercial operation dates as filed run from Mar 2008 to Jun 2030 (4 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: ComEd (1 filing).
3active projects
400active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2138 | Calumet 138 kV | 138 | 365 | Battery | Active | Jun 2030 |
| AG1-507 | Southeast Chicago Energy Project (aka SCEP) | 138 | 296 | Gas | Withdrawn | Jun 2024 |
| U1-054 | River Energy Center | n/r | 27 | Gas | In Service | Mar 2008 |
| AF2-031 | Calumet BESS | n/r | 8 | Battery | Engineering and Procurement | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Cook County, IL
- Chicago Heights: 1 active, 250 MW of 5 filed
- Burnham: 2 active, 200 MW of 2 filed
- Mount Rose: 1 active, 0.3 MW of 2 filed
- Crawford: none active of 3 filed
- Bloom: none active of 2 filed
- Clybourn: none active of 2 filed
- Hegewisch: none active of 2 filed
- I.C. Air Rights: none active of 2 filed
- River EC: none active of 2 filed
- Robbins: none active of 2 filed
Site Scanner