Calumet substation interconnection queue
3 active projects totalling 400 MW in the PJM queue, plus 1 with terminal status (shown greyed).
3active projects
400active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2138 | Calumet 138 kV | 138 | 365 | Battery | Active |
| AG1-507 | Southeast Chicago Energy Project (aka SCEP) | 138 | 296 | Gas | Withdrawn |
| U1-054 | River Energy Center | n/r | 27 | Gas | In Service |
| AF2-031 | Calumet BESS | n/r | 8 | Battery | Engineering and Procurement |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.