Bloom substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Jan 2014 to Jun 2022 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-496 | Bloom 34.5 kV | 34.5 | 0 | Solar | Withdrawn | Jun 2022 |
| W1-109 | Bloom 138kV | 138 | 0 | Battery | Withdrawn | Jan 2014 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Madison County, OH
- Marysville - Flatlick: 1 active, 2,040 MW of 3 filed
- Marysville-Flatlick: 4 active, 769.8 MW of 11 filed
- Beatty-Greene: 2 active, 490.3 MW of 2 filed
- Cardington: 1 active, 200 MW of 2 filed
- Beatty-London: 2 active, 79.2 MW of 3 filed
- Adkins: 3 active, 48 MW of 3 filed
- Beatty-London III: none active of 2 filed
- Greene - Beatty: none active of 2 filed
Other PJM queue substations in Cook County, IL
- Calumet: 3 active, 400 MW of 4 filed
- Chicago Heights: 1 active, 250 MW of 5 filed
- Burnham: 2 active, 200 MW of 2 filed
- Mount Rose: 1 active, 0.3 MW of 2 filed
- Crawford: none active of 3 filed
- Clybourn: none active of 2 filed
- Hegewisch: none active of 2 filed
- I.C. Air Rights: none active of 2 filed
- River EC: none active of 2 filed
- Robbins: none active of 2 filed