Cook, IL interconnection queue
10 active projects totalling 1,573.4 MW in the PJM queue, plus 35 with terminal status (shown greyed).
10active projects
1,573.4active MW
45total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AC1-067 | Davis Creek-Burnham | n/r | 1,092 | Gas | Withdrawn |
| AC1-005 | Zion-Stateline | n/r | 1,000 | Not reported | Withdrawn |
| AG1-298 | Calumet-Burnham 345 kV | 345 | 500 | Battery | Withdrawn |
| C01-1355 | Calumet - Burnham 345 kV | 345 | 500 | Battery | Active |
| C01-2138 | Calumet 138 kV | 138 | 365 | Battery | Active |
| AG1-507 | Southeast Chicago Energy Project (aka SCEP) | 138 | 296 | Gas | Withdrawn |
| C01-1334 | Chicago Heights 138kV 138 kV | 138 | 250 | Battery | Active |
| AH1-616 | Chicago Heights 138 kV | 138 | 150 | Battery | Withdrawn |
| C01-2116 | Fisk 138 kV | 138 | 135 | Battery | Active |
| C01-1332 | Burnham 138 kV | 138 | 120 | Battery | Active |
| AI1-155 | Chicago Heights 138kV | 138 | 110 | Battery | Withdrawn |
| AH1-673 | State Line - River Energy Center 138 kV | 138 | 85 | Battery | Active |
| AF2-441 | Riverbank Energy | 138 | 80 | Battery | EP |
| AI1-182 | Des Plaines 138 kV | 138 | 80 | Battery | Withdrawn |
| AH1-663 | River EC 138 kV | 138 | 57.8 | Battery | Withdrawn |
| R35 | Robbins Community Power | 138 | 50 | Other | Withdrawn |
| AA1-129 | Northbrook-Skokie | n/r | 27 | Gas | Withdrawn |
| U1-054 | River Energy Center | n/r | 27 | Gas | In Service |
| AH2-380 | Matteson - East Frankfort 138 kV | 138 | 26.4 | Hybrid | Withdrawn |
| AH1-101 | River EC 138 kV | 138 | 23.1 | Battery | Withdrawn |
| C01-2131 | ESS Z725 - B 138 KV 34.5 kV | 138 | 20 | Battery | Withdrawn |
| AH2-205 | I.C. Air Rights 12.5 kV | 12.5 | 10 | Battery | Withdrawn |
| AH2-206 | I.C. Air Rights 12.5 kV | 12.5 | 10 | Battery | Withdrawn |
| AF2-031 | Calumet BESS | n/r | 8 | Battery | Engineering and Procurement |
| Q14 | Hegewisch 12kV | 12 | 6.6 | Gas | Withdrawn |
| Q17 | Northbrook 12kV | 12 | 6.6 | Gas | Withdrawn |
| X2-091 | Hegewisch 34kV | 34 | 3.8 | Solar | Withdrawn |
| Q67 | LaGrange Park - West Chester Sexton Energy | n/r | 3.5 | Gas | Withdrawn |
| Q67B | Mt. Prospect - Des Plaines Sexton Energy | n/r | 3.5 | Gas | Withdrawn |
| X3-005 | City Solar | 12 | 3.4 | Solar | In Service |
| W4-087 | South Holland | n/r | 3.1 | Gas | Withdrawn |
| AH1-029 | WV-PJM1 12 kV | 12 | 1 | Solar | Withdrawn |
| AH1-030 | WV PJM2 12 kV | 12 | 1 | Solar | Withdrawn |
| AB2-138 | Clybourn 12.5kV | 12.5 | 0 | Battery | Withdrawn |
| AC1-013 | Western Avenue Battery | 12.5 | 0 | Battery | Withdrawn |
| AH2-067 | Mount Rose 13 kV | 13 | 0 | Solar | Withdrawn |
| AH2-296 | Not reported | n/r | 0 | Solar | Withdrawn |
| AH2-311 | Not reported | n/r | 0 | Solar | Withdrawn |
| AH2-312 | Not reported | n/r | 0 | Solar | Withdrawn |
| AH2-313 | Not reported | n/r | 0 | Solar | Withdrawn |
| AH2-314 | Not reported | n/r | 0 | Solar | Withdrawn |
| AH2-315 | Not reported | n/r | 0 | Solar | Withdrawn |
| W1-109 | Bloom 138kV | 138 | 0 | Battery | Withdrawn |
| X4-028 | Northerly Island | n/r | 0 | Battery | Withdrawn |
| Y1-078 | Crawford 138kV | 138 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.