Crawford substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
Target commercial operation dates as filed run from Dec 2012 to May 2027 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-480 | Crawford 34.5 kV | 34.5 | 5.8 | Solar | Withdrawn | May 2027 |
| AH2-095 | Crawford 13.8 kV | 13.8 | 2 | Solar | Withdrawn | Jul 2022 |
| Y1-078 | Crawford 138kV | 138 | 0 | Battery | Withdrawn | Dec 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Crawford County, PA
- Erie West: 1 active, 1,100 MW of 7 filed
- Wayne: 1 active, 530 MW of 4 filed
- Geneva: 2 active, 35.5 MW of 6 filed
- Union City-Cambridge Springs: 1 active, 12 MW of 2 filed
- Morgan Street-Cochranton: 1 active, 9 MW of 2 filed
- Union City: 2 active, 8.9 MW of 6 filed
- Titusville: none active of 3 filed
- Conneaut-Conneaut Tap: none active of 2 filed
- Corry East: none active of 2 filed
- Jamestown-Hartstown: none active of 2 filed
- Springboro-Venango Junction: none active of 2 filed
- Titusville-Oil Creek: none active of 2 filed
Other PJM queue substations in Cook County, IL
- Calumet: 3 active, 400 MW of 4 filed
- Chicago Heights: 1 active, 250 MW of 5 filed
- Burnham: 2 active, 200 MW of 2 filed
- Mount Rose: 1 active, 0.3 MW of 2 filed
- Bloom: none active of 2 filed
- Clybourn: none active of 2 filed
- Hegewisch: none active of 2 filed
- I.C. Air Rights: none active of 2 filed
- River EC: none active of 2 filed
- Robbins: none active of 2 filed