Substation Scout

Crawford substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AI2-480 Crawford 34.5 kV 34.5 5.8 Solar Withdrawn
AH2-095 Crawford 13.8 kV 13.8 2 Solar Withdrawn
Y1-078 Crawford 138kV 138 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.