Garrison Energy Center

PJM queue ID W3-032A

Garrison Energy Center (W3-032A) is listed in the PJM interconnection queue as a 309.2 MW gas project in New Castle County, DE. The filing names Cartanza as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2015.

Queue IDW3-032A
Project nameGarrison Energy Center
Status (as published)In Service
SubstationCartanza
Point of interconnectionCartanza 230kV
CountyNew Castle
StateDE
Voltage230 kV
Capacity309.2 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2015-06-01
Source datasetserial

Same substation and county

Cartanza substation: 7 requests in the PJM queue, 1 active totaling 309.2 MW.

Queue IDProjectMWResourceStatus
AA2-069Garrison Energy Center451GasWithdrawn
X2-067Cartanza 230kV309GasWithdrawn
AG1-497Cartanza 230 kV84HybridWithdrawn
AH1-027Cartanza 230 kV15SolarWithdrawn
AE1-038Cartanza 69 kV8.4SolarWithdrawn
W3-087Cartanza 230kV5.7SolarWithdrawn

New Castle, DE: 65 requests in the PJM queue, 31 active totaling 1,405.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy309.2
MW capacity309.2
MFO309.2

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.