Garrison Energy Center
PJM queue ID W3-032A
Garrison Energy Center (W3-032A) is listed in the PJM interconnection queue as a 309.2 MW gas project in New Castle County, DE. The filing names Cartanza as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2015.
| Queue ID | W3-032A |
|---|---|
| Project name | Garrison Energy Center |
| Status (as published) | In Service |
| Substation | Cartanza |
| Point of interconnection | Cartanza 230kV |
| County | New Castle |
| State | DE |
| Voltage | 230 kV |
| Capacity | 309.2 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2015-06-01 |
| Source dataset | serial |
Same substation and county
Cartanza substation: 7 requests in the PJM queue, 1 active totaling 309.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AA2-069 | Garrison Energy Center | 451 | Gas | Withdrawn |
| X2-067 | Cartanza 230kV | 309 | Gas | Withdrawn |
| AG1-497 | Cartanza 230 kV | 84 | Hybrid | Withdrawn |
| AH1-027 | Cartanza 230 kV | 15 | Solar | Withdrawn |
| AE1-038 | Cartanza 69 kV | 8.4 | Solar | Withdrawn |
| W3-087 | Cartanza 230kV | 5.7 | Solar | Withdrawn |
New Castle, DE: 65 requests in the PJM queue, 31 active totaling 1,405.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 309.2 |
| MW capacity | 309.2 |
| MFO | 309.2 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.