Railroad DP
Named in 1 PJM planning document for 1 project, on December 5, 2023.
Not stateddescribed as
DOMzone
230kVkV as printed
1mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
Part of a named transmission project: 2022 Window 3 South Cluster ($1,265.85M).
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| 2022W3 – Recommended Solutions: South Cluster B3800.311 – B3800.357 |
Not printed | $842.19 M | 6/1/2028 | Not printed | 2023-12-05 TEAC |
Other substations in this project
“2022W3 – Recommended Solutions: South Cluster” also names 19 other substations, with what the most recent document says about each.
- Brambleton DOM Work described at it — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch” (p. 27)
- Bristers DOM, VA Work described at it — “Substation upgrades at: – Bristers, Brambleton” (p. 27)
- Burrell Substation DOM New — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch, Gainesville, Heathcote, Loudoun, Mint Springs” (p. 28)
- Dawkins Branch DOM New — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch” (p. 28)
- Gainesville DOM Work described at it — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch, Gainesville” (p. 27)
- Heathcote DOM Work described at it — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch, Gainesville, Heathcote” (p. 28)
- Liberty DOM Work described at it
- Loudoun DOM, VA Work described at it — “Breaker upgrades at the following substations: – Loudoun 230kV, Ox 500kV” (p. 27)
- Meadowbrook DOM Not stated
- Morrisville DOM, VA Work described at it — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch, Gainesville, Heathcote, Loudoun, Mint Springs, Morrisville” (p. 27)
- Mosby DOM Work described at it — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch, Gainesville, Heathcote, Loudoun, Mint Springs, Morrisville, Mosby” (p. 27)
- North Star DOM Work described at it — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch, Gainesville, Heathcote, Loudoun, Mint Springs, Morrisville, Mosby, North Star” (p. 28)
- Racefield DOM Work described at it — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch, Gainesville, Heathcote, Loudoun, Mint Springs, Morrisville, Mosby, North Star, Racefield” (p. 27)
- Railroad DOM, VA Work described at it — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch, Gainesville, Heathcote, Loudoun, Mint Springs, Morrisville, Mosby, North Star, Racefield, Railroad” (p. 28)
- Remington CT DOM, VA Work described at it
- Rollins Ford DOM Not stated
- Vint Hill DOM Expansion — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch, Gainesville, Heathcote, Loudoun, Mint Springs, Morrisville, Mosby, North Star, Racefield, Railroad, Vint Hill” (p. 27)
- Wishing Star DOM New — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch, Gainesville, Heathcote, Loudoun, Mint Springs, Morrisville, Mosby, North Star, Racefield, Railroad, Vint Hill, Wishing Star” (p. 27)
- Youngs Branch DOM Work described at it — “Substation upgrades at: – Bristers, Brambleton, Dawkins Branch, Gainesville, Heathcote, Loudoun, Mint Springs, Morrisville, Mosby, North Star, Racefield, Railroad, Vint Hill, Wishing Star, Youngs Branch” (p. 28)
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2023-12-05 | TEAC Item 15 - Reliability Analysis Update 2022 Window 3 p. 28 |
2022W3 – Recommended Solutions: South Cluster | No role wording 230kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation", or when a PJM document prints a rename for the same project (src/ingest/rtepAliases.json; the entry lists its old names).
- role is "new" only where a cited document phrase calls the substation new, describes constructing it, or calls it proposed (graded by src/lib/roleBasis.js), "existing" where a phrase describes work at it, otherwise "unknown".
- expansion is set on a substation that is not "new" where a cited phrase describes a new voltage level, a new or expanded yard, bus or bay, or a named load connected to it (graded by src/lib/expansionBasis.js). It reproduces what the document describes and adds nothing to it.
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.
Site Scanner