Shemesh Solar Farm
PJM queue ID W2-019
Shemesh Solar Farm (W2-019) is listed in the PJM interconnection queue as a 2.3 MW solar project in Burlington County, NJ. The filing names Wrightstown as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 30, 2016.
| Queue ID | W2-019 |
|---|---|
| Project name | Shemesh Solar Farm |
| Status (as published) | In Service |
| Substation | Wrightstown |
| Point of interconnection | Wrightstown 34.5kV |
| County | Burlington |
| State | NJ |
| Voltage | 34.5 kV |
| Capacity | 2.3 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2016-09-30 |
| Source dataset | serial |
Same substation and county
Wrightstown substation: 4 requests in the PJM queue, 1 active totaling 2.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| X1-077 | Saylos Pond Solar Farm | 0.8 | Solar | Withdrawn |
| W2-077 | Wrightstown 34.5kV | 0 | Solar | Withdrawn |
| W3-025 | Saylors Pond Solar Farm | 0 | Solar | Withdrawn |
Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 6 |
| MW capacity | 2.3 |
| MFO | 6 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.