Shemesh Solar Farm (W2-019) is listed in the PJM interconnection queue as a 2.3 MW solar project in Burlington County, NJ. The filing names Wrightstown as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 30, 2016.

Queue IDW2-019
Project nameShemesh Solar Farm
Status (as published)In Service
SubstationWrightstown
Point of interconnectionWrightstown 34.5kV
CountyBurlington
StateNJ
Voltage34.5 kV
Capacity2.3 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2016-09-30
Source datasetserial

Same substation and county

Wrightstown substation: 4 requests in the PJM queue, 1 active totaling 2.3 MW.

Queue IDProjectMWResourceStatus
X1-077Saylos Pond Solar Farm0.8SolarWithdrawn
W2-077Wrightstown 34.5kV0SolarWithdrawn
W3-025Saylors Pond Solar Farm0SolarWithdrawn

Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy6
MW capacity2.3
MFO6

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first