Salem - East Windsor substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Salem - East Windsor as the point of interconnection, all in Burlington County, NJ.
Target commercial operation dates as filed run from Jun 2004 to Dec 2004 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| D27 | Salem - East Windsor 500kV | 500 | 550 | Gas | Withdrawn | Dec 2004 |
| H07 | Salem - East Windsor 500kV | 500 | 200 | Gas | Withdrawn | Jun 2004 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Burlington County, NJ
- Burlington: 8 active, 450.1 MW of 24 filed
- Crosswicks: 2 active, 161 MW of 3 filed
- Southampton: 2 active, 81.1 MW of 7 filed
- Lumberton: 2 active, 6.8 MW of 14 filed
- Cookstown-Fort Dix: 2 active, 4.5 MW of 3 filed
- Trenton: 1 active, 3 MW of 6 filed
- Levittown: 2 active, 2.7 MW of 7 filed
- Mt. Holly: 1 active, 2.7 MW of 3 filed
- Wrightstown: 1 active, 2.3 MW of 4 filed
- Bustleton: 1 active, 2.1 MW of 5 filed
- Deptford: 1 active, 1.9 MW of 6 filed
- Cookstown: 1 active, 1.9 MW of 3 filed
- Cinnaminson: 2 active, 1.4 MW of 2 filed
- Medford: 1 active, 0.4 MW of 3 filed
- TBD: none active of 20 filed
- Camden: 1 active, 0 MW of 8 filed
- Tabernacle: none active of 7 filed
- North Hanover: none active of 4 filed
- Yardville: none active of 3 filed
- Cookstown-New Lisbon: none active of 2 filed
All 118 PJM queue filings in Burlington County, NJ, including 2 more substations.
Site Scanner