Ladysmith- Elmont substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Ladysmith- Elmont as the point of interconnection, all in Caroline County, VA.
Target commercial operation date as filed: Dec 2024 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-237 | Ladysmith- Elmont 230kV | 230 | 78 | Solar | Withdrawn | Dec 2024 |
| AH1-238 | Ladysmith- Elmont 230kV | 230 | 50 | Battery | Withdrawn | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Caroline County, VA
- Ladysmith: 5 active, 510 MW of 7 filed
- Remington: 6 active, 317.6 MW of 9 filed
- Ladysmith CT: 5 active, 116 MW of 14 filed
- Kings Dominion DP: 1 active, 44.4 MW of 6 filed
- Ladysmith II: 1 active, 15 MW of 2 filed
- Correctional: 1 active, 13.8 MW of 2 filed
- St. Johns: 1 active, 8.8 MW of 10 filed
- Ladysmith CT-St. Johns: none active of 4 filed
- Ladysmith CT-Mine Road: none active of 2 filed