Remington 230 kV

PJM queue ID C01-2173

Remington 230 kV (C01-2173) is listed in the PJM interconnection queue as a 250 MW battery project in Fauquier County, VA. The filing names Remington as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.

Queue IDC01-2173
Project nameRemington 230 kV
Status (as published)Active
SubstationRemington
Point of interconnectionRemington 230 kV
CountyFauquier
StateVA
Voltage230 kV
Capacity250 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-12-31
Source datasetcycle

Same substation and county

Remington substation: 9 requests in the PJM queue, 6 active totaling 317.6 MW.

Queue IDProjectMWResourceStatus
S93Remington GT115GasIn Service
S94Remington GT215GasIn Service
S95Remington GT315GasIn Service
S96Remington GT415GasIn Service
AB2-029Remington 34.5kV7.6SolarIn Service
AI2-001Remington 115 kV150BatteryWithdrawn
AG2-620Remington 230 kV100BatteryWithdrawn
AG2-178Remington 34.5 kV9.3SolarWithdrawn

Fauquier, VA: 52 requests in the PJM queue, 18 active totaling 2,367 MW.

A substation with the same name is named in PJM transmission planning materials: Remington (DOM, 6 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperMirror Pass Storage LLC
Transmission ownerDominion
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy250.0
MW capacity250.0
MFO250.0
Submitted date4/27/2026
Last updated6/23/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.