Kings Dominion DP substation interconnection queue

1 active project totalling 44.4 MW in the PJM queue, plus 5 with terminal status (shown greyed).

1active projects
44.4active MW
6total filed
Queue IDProjectkVMWResourceStatus
AF1-031 Kings Dominion DP 115 kV 115 60.7 Solar Withdrawn
AG1-134 Kings Dominion DP 115 kV 115 60 Solar Withdrawn
AD1-105 Sweet Sue Solar 115 44.4 Solar Under Construction
AF1-067 Kings Dominion DP 115 kV 115 30 Hybrid Withdrawn
AE2-108 Kings Dominion DP 115 kV 115 8.4 Solar Withdrawn
AE2-109 Kings Dominion DP 115 kV 115 2.9 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.