Ladysmith CT substation interconnection queue
5 active projects totalling 116 MW in the PJM queue, plus 9 with terminal status (shown greyed).
5active projects
116active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W1-073 | Ladysmith CT 230kV | 230 | 498 | Gas | Withdrawn |
| AI1-010 | Ladysmith CT 230 kV | 230 | 200 | Battery | Withdrawn |
| AH1-222 | Ladysmith CT 230 kV | 230 | 30 | Battery | Withdrawn |
| AH1-691 | Ladysmith CT 230 kV | 230 | 26 | Gas | Active |
| AH1-692 | Ladysmith CT 230 kV | 230 | 26 | Gas | Active |
| AH1-683 | Ladysmith CT 230 kV | 230 | 25 | Gas | Active |
| AH1-682 | Ladysmith CT 230 kV | 230 | 21 | Gas | Active |
| AG1-154 | Ladysmith Battery Storage | 230 | 20 | Battery | Withdrawn |
| AH1-694 | Ladysmith CT 230 kV | 230 | 18 | Gas | Active |
| AI2-283 | Ladysmith CT 230 kV | 230 | 12.3 | Gas | Withdrawn |
| AI2-282 | Ladysmith CT 230 kV | 230 | 11.3 | Gas | Withdrawn |
| AI2-284 | Ladysmith CT 230 kV | 230 | 10.2 | Gas | Withdrawn |
| AI2-285 | Ladysmith CT 230 kV | 230 | 9.9 | Gas | Withdrawn |
| AI2-286 | Ladysmith CT 230 kV | 230 | 9.4 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.