Ladysmith II substation interconnection queue
1 active project totalling 15 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
15active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-627 | Ladysmith 230 kV II | 230 | 62.5 | Battery | Withdrawn |
| AC2-126 | Ladysmith Combustion Turbines Unit 2 | 230 | 15 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.