Ladysmith II substation interconnection queue

1 active project totalling 15 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
15active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-627 Ladysmith 230 kV II 230 62.5 Battery Withdrawn
AC2-126 Ladysmith Combustion Turbines Unit 2 230 15 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.