St. Johns substation interconnection queue
2 active projects totalling 15.1 MW in the PJM queue, plus 8 with terminal status (shown greyed).
2active projects
15.1active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-038 | St. Johns 115kV | 115 | 90 | Solar | Withdrawn |
| AF2-035 | Anna River Solar | 115 | 48 | Solar | Withdrawn |
| AG1-541 | St. Johns 115 kV | 115 | 32 | Battery | Withdrawn |
| AE2-231 | St. Johns 115 kV | 115 | 26.4 | Solar | Withdrawn |
| AF2-300 | St. Johns 115 kV | 115 | 12 | Solar | Withdrawn |
| AG1-073 | St. Johns 115 kV | 115 | 12 | Solar | Withdrawn |
| AG1-074 | St. Johns 115 kV | 115 | 12 | Solar | Withdrawn |
| C01-1891 | St. Johns 34.5 kV | 34.5 | 8.8 | Solar | Active |
| C01-1894 | St. Johns 34.5 kV | 34.5 | 6.3 | Solar | Active |
| AC1-115 | St. Johns 115kV | 115 | 5.7 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.