St. Johns substation interconnection queue

2 active projects totalling 15.1 MW in the PJM queue, plus 8 with terminal status (shown greyed).

2active projects
15.1active MW
10total filed
Queue IDProjectkVMWResourceStatus
AI2-038 St. Johns 115kV 115 90 Solar Withdrawn
AF2-035 Anna River Solar 115 48 Solar Withdrawn
AG1-541 St. Johns 115 kV 115 32 Battery Withdrawn
AE2-231 St. Johns 115 kV 115 26.4 Solar Withdrawn
AF2-300 St. Johns 115 kV 115 12 Solar Withdrawn
AG1-073 St. Johns 115 kV 115 12 Solar Withdrawn
AG1-074 St. Johns 115 kV 115 12 Solar Withdrawn
C01-1891 St. Johns 34.5 kV 34.5 8.8 Solar Active
C01-1894 St. Johns 34.5 kV 34.5 6.3 Solar Active
AC1-115 St. Johns 115kV 115 5.7 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.