Substation Scout

Ladysmith substation interconnection queue

5 active projects totalling 510 MW in the PJM queue, plus 2 with terminal status (shown greyed).

5active projects
510active MW
7total filed
Queue IDProjectkVMWResourceStatus
R19 Ladysmith CT Units 3 & 4 230 340 Gas In Service
S102 Ladysmith Combustion Turbine Unit 5 230 170 Gas In Service
AG2-320 Ladysmith 230 kV 230 105 Battery Withdrawn
AH1-626 Ladysmith 230 kV 230 62.5 Battery Withdrawn
U1-093 Ladysmith Unit 3 230 0 Other In Service
U1-094 Ladysmith Unit 4 230 0 Other In Service
U1-095 Ladysmith Unit 5 230 0 Other In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.