Ladysmith CT-St. Johns substation interconnection queue

1 active project totalling 77.8 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
77.8active MW
4total filed
Queue IDProjectkVMWResourceStatus
AE1-158 Ladysmith CT-St. Johns 230 kV 230 79.4 Solar Withdrawn
AE1-157 CC Solar I 230 77.8 Solar Engineering and Procurement
AF2-049 Ladysmith CT-St. Johns 230 kV 230 34.5 Solar Withdrawn
AG1-013 Ladysmith CT-St. Johns 230 kV 230 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.