Pine Grove substation interconnection queue

1 active project totalling 8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
8active MW
2total filed
Queue IDProjectkVMWResourceStatus
I17 Pine Grove 69kV 69 9.9 Gas Withdrawn
O26 Guilford Mills LF 69 8 Other In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.