Frackville-Hauto #3 substation interconnection queue
3 active projects totalling 7.1 MW in the PJM queue.
3active projects
7.1active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| N14 | Locust Ridge WF | 69 | 5.4 | Wind | In Service |
| P03 | Locust Ridge WF | n/r | 1.3 | Wind | In Service |
| O46 | Locust Ridge WF | 69 | 0.4 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.