North Temple substation interconnection queue

1 active project totalling 557 MW in the PJM queue, plus 5 with terminal status (shown greyed).

1active projects
557active MW
6total filed
Queue IDProjectkVMWResourceStatus
S116 North Temple 230kV 230 912 Gas Withdrawn
Z2-026 North Temple 230kV 230 800 Gas Withdrawn
V4-020 North Temple 230kV 230 650 Gas Withdrawn
H10 North Temple 230kV 230 560 Gas Withdrawn
A18 North Temple 230 kV 230 557 Gas In Service
X3-006 North Temple 230kV 230 110 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.