Frackville-Fishbach substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
Z2-101 Frackville-Fishbach 69kV 69 8.8 Wind Withdrawn
V1-029 Frackville-Fishbach 69kV 69 0.8 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.