S. Reading-Birdsboro substation interconnection queue

1 active project totalling 6.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
6.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
Q59 Pioneer Crossing LF 64 6.4 Other In Service
X2-049 S. Reading-Birdsboro 64kV 64 3.2 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.