Substation Scout

Frackville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
R27 Frackville n/r 52 Coal Withdrawn
G34 Frackville 69kV 69 51.6 Coal Withdrawn
U2-069 Broad Mountain WF n/r 7.3 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.