Birdsboro substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G47 | Birdsboro 69kV | 69 | 32 | Gas | Withdrawn |
| G48 | Birdsboro 69kV | 69 | 10 | Gas | Withdrawn |
| K16 | Birdsboro 69kV | 69 | 9.9 | Gas | Withdrawn |
| L20 | Birdsboro 13.2kV | 13.2 | 9.9 | Gas | Withdrawn |
| F06 | Birdsboro 13.2kV | 13.2 | 6.5 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.