Substation Scout

Lynnville-South Hamburg substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-419 Mountain Trail Solar 69 21 Solar Withdrawn
AI2-414 Lynnville-South Hamburg 69 kV 69 12.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.